6 April 2012
We caught a bus from Queenstown to Clyde where we were meet by the people who gave us our bikes and panniers. After sorting out our gear we were on the road for our first day of the rail trail.
In Queenstown ready to get on the bus to Clyde
In Clyde with our bikes and ready to go
Kara and George - I shouldnt have told George how to back pedal : )
Rebecca and Milly
Our first stop was Clyde Dam with the steepest hill in the entire rail
Cruising along the river banks of our side trip along the anniversary track
At each stop someone had to down a beer. This is an old drill head
First challenge - looser of paper/scissor/rocks goes swimming in the river
Glenn and I luck out
Beer stop - old gold dredging site
Anna has a go on the rope swing
The convoy
Michelle and Tania getting their Rail Trail passports stamped
The old bridge in Alexandra
The Alexandra clock
We stop for lunch in the park
The ladies waiting room at the train stop at Galloway station
Becs squeezes the baby trailer through the cattle stop
Dave and I go for a swim to cool off
Beer stop - one of the many gangers sheds along the trail with information panels
No comments:
Post a Comment